Hanuni Consulting & Engineering (H.I) Ltd founded on 3/2011 by Eng. Itsik Hanuni – Mechanical Engineer, who is active for the last 15 years in the energy sector / natural gas projects.
-
Among others, Eng. Itsik Hanuni is part of the technical committee for the preparation and approval of the Israeli standard 5664-1,2,3,4 for natural gas (high/low pressure)
-
Eng. Itsik Hanuni holding the certifications of NDT level 2, as to ASNT for following subjects: Radiograph, Ultrasonic, Magnetic particle, Dye penetrate and Visual.
-
CSWIP 3.1 CS Welding inspector – Level 2 (Approved by the National Gas Authority)
-
PE Welding Inspector (Approved by the National Gas Authority)
-
Certified by the DVGW for the natural gas
-
The Company head office is located in Netanya, Israel

The Company scope of services includes:
-
Providing 2nd party supervision services in the field of welding inspection (both Carbon Steel and Polyethylene) and QA/QC for factories converting them consumers for use of natural gas.
-
Advising and consulting to the factories which are interesting to convert to natural gas from signing agreement with the local distribution company, purchasing the natural gas, issuing tender for turn key contractor, advising during the design, during the construction and in the end of the project accompany the “gassing up” of the consumers.
-
Advising to the local distributions companies
-
General engineering services including preparation of work procedures, specification, approval of Contractors, welders qualification etc.
2nd party supervision – scope of services:
-
Material selections
-
Material and Service Procurement
-
Mechanical Engineering
-
Verify the compliance of equipment upon clients purchase orders and specifications.
-
Providing new specifications when required by the client.
-
Review the engineering design
-
Checking the manufacturer drawings and calculations prior to the production.
-
Checking the inspection test plan (ITP) and the quality control plans (QCP)
-
Checking during the production in the manufacturer workshop
-
Checking and witnessing during the final acceptance test (FAT)
-
Checking the content of the quality certificate types (3.1/3.2) and the compliance with the client specifications.
-
Checking of welding procedure\Checking for the NDT report
-
Pipe mill Inspections
-
General Inspections and Certification
-
Preparation of Scope of Works
-
Calculation for fittings, pipe